Special machinery
ATP Hydraulik was assigned by the German company Siempelkamp NIS Ingenieurgesellschaft mbH for the co-development and construction of a cross-cutting-device.
These machines will cut contaminated and highly radioactive parts under water during the dismantling of the Mühleberg nuclear power plant. The several thousand tons of concrete, steel and cable internals have to be dismantled and packed for the final repository.
The nuclear dismantling of the Mühleberg nuclear power plant is planned for the years 2021 to 2024. During this period, the portal diamond wire saw will be used as an important dismantling instrument for several months. At the end of the period of use, the machine will be dismantled and sent to the designated disposal routes of the KKM.
Cross cutting device
Longitudinal separating device
Facts
Place: Nuclear power plant, Mühleberg Switzerland
Date: 2020
Scope of delivery:
- Machine construction
- Hydraulic system
- Electrical control system
- Engineering
- Supply of spare parts