Back-up installations to TBM

About the project:
ATP Hydraulik produced the hydraulic drives for

  • the back-up installations to the tunnel boring machine (back-ups 1-5)
  • the duct storage cassettes
  • the belt tensioning system

Environmental informations:
The safety tunnel along the existing Giessbach motorway tunnel (A8) has a lenght of approx. 3'300 m and a drilling diameter of 5.2 m. The rock heading is carried out mostly declining with an open TBM, starting from the west portal in the direction of east. In total, 10 new emergency exits are built, which connects the road tunnel with accessible cross connections to the safety tunnel.

Giessbach (Switzerland)

Facts

Place: Giessbach, Berne, Switzerland
Time of project: 6.5 months
Date: 2014
Scope of delivery:

  • Hydraulic power pack and hydraulics to
    2x robotic spray systems
    2x longitudinal displacements with synchronisation control
    Anchor setting tool
    Sohlreinigung
  • Hydraulic power pack and hydraulics to duct storage cassettes
  • Hydraulic power pack and hydraulics to conveyor belt accumulator
    Electrical control system incl. software