Back-up installations to TBM
About the project:
ATP Hydraulik produced the hydraulic drives for
- the back-up installations to the tunnel boring machine (back-ups 1-5)
- the duct storage cassettes
- the belt tensioning system
Environmental informations:
The safety tunnel along the existing Giessbach motorway tunnel (A8) has a lenght of approx. 3'300 m and a drilling diameter of 5.2 m. The rock heading is carried out mostly declining with an open TBM, starting from the west portal in the direction of east. In total, 10 new emergency exits are built, which connects the road tunnel with accessible cross connections to the safety tunnel.
Giessbach (Switzerland)
Facts
Place: Giessbach, Berne, Switzerland
Time of project: 6.5 months
Date: 2014
Scope of delivery:
- Hydraulic power pack and hydraulics to
2x robotic spray systems
2x longitudinal displacements with synchronisation control
Anchor setting tool
Sohlreinigung - Hydraulic power pack and hydraulics to duct storage cassettes
- Hydraulic power pack and hydraulics to conveyor belt accumulator
Electrical control system incl. software